ACAM
FEASIBILITY STUDY AND FINAL DETAILED PLAN OF THE BIO-DRYING AND REFUSED DERIVED FUEL (RDF) PRODUCTION PLANT IN THE PROVINCE OF LA SPEZIA
Description of the work
The plant was configured in accordance with the 2003 Provincial Plan of La Spezia with the aim to produce bio-dried waste (stabilised and non-fermentable) and Refused Derived Fuel (RDF) from undifferentiated urban solid waste.
The plant was designed to work continuously and exclusively processing biological matter 312 days per year.Related products documents:
Assessment of the project compatibility with the planning and programming regulations in force; hydraulic, geological, seismic, geotechnical and hydro-geological studies; monographic study of the atmosphere, noise and traffic.Strategic Impact Assessment
The Regional Law no. 38/1998 establishes that a system of this type, with a potential production higher than 100 tons per day, requires an Environmental Impact Assessment. The study was performed by ambiente in accordance with the technical standards established by the Regional Deliberation no. 1415 of 26/11/1999.ambiente s.c. SERVICES
- Project management
- Environmental Impact Assessment
- Air pollution dispersion model
- Acoustic Impact Assessment
- Electromagnetic Impact Assessment
- Authorisation procedures
- Feasibility study
- Final design
- Construction design
-
Design and drafting of environmental studies: final design, construction design, environmental impact assessment, waste management, distribution studies
Commissioner:
ACAM S.p.A.
Start-end year
2005-2006